№8|2020

WASTEWATER TREATMENT

DOI 000000

UDC 628.35:661.5

Danilovich Dmitrii, Smirnov Aleksandr Vladimirovich

The technology of step-feed nitri-denitrification in municipal wastewater treatment: the analysis of options and case record

Summary

The experience of MY PROJECT JSC in designing biological treatment facilities (aeration tanks) at the municipal treatment facilities of the Russian Federation with the use of step-feed nitri-denitrification is considered. Over the past 10 years more than 20 treatment facilities have been upgraded and built with the introduction of a step-feed scheme; the author of the article made a personal commitment in commissioning of more than 10 biological treatment facilities for municipal and industrial wastewater processing. In order to observe the data confidentiality, no data is provided on the chemical analysis of the operation of structures; however, with the help of mathematical modeling, the specific features of the implementation of step-feed denitrification are shown. The key process engineering aspects of the implementation of the schemes of a step-feed process with a different number of stages (two and three), cases of the need to use or reject nitrate recycling, as well as using, where applicable, an additional substrate (methanol) with particularly stringent requirements to the nitrogen concentration at the effluent discharge are considered. Traditionally, it is believed that the scheme of step-feed denitrification is designed for nitrogen removal; however, additional positive modifications of step-feed denitrification have been also considered that provide for arranging biological removal of phosphorus. The design of an anaerobic zone upstream the first denitrification cascade (D1), the use of step-feed denitrification in the implementation of the process scheme of the University of Johannesburg (JHB), as well as the arrangement of step-feed of return sludge are considered.

Key words

, , , , ,

The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe

REFERENCES

  1. Meshengisser Iu. M. Retekhnologizatsiia sooruzhenii ochistki stochnykh vod [Retechnologization of wastewater treatment facilities. Moscow, Vokrug Tsveta Publishing House, 2012. 211 p.].
  2. Meshengisser Iu. M., Shchetinin A. I., Esin M. A., Regotun A. A. [The experience of retechnologizing the existing wastewater treatment facilities]. Vodosnabzhenie i Sanitarnaia Tekhnika, 2012, no. 1, pp. 43–50. (In Russian).
  3. Danilovich D. A., Kozlov M. N. [25 years of the industrial-scale introduction of the technologies of nitrogen and phosphorus removal at the Moscow wastewater treatment facilities: 20 approbated process solutions]. Nailuchshchie Dostupnye Tekhnologii Vodosnabzheniia i Vodootvedeniia, 2018, no. 6, pp. 58–71. (In Russian).
  4. Smyrnov O. V., Esin M. A. [Automation and energy efficiency improvement of the wastewater treatment facilities operation according to the BAT requirements: best practices]. Nailuchshchie Dostupnye Tekhnologii Vodosnabzheniia i Vodootvedeniia, 2018, no. 2, pp. 38–50. (In Russian).
  5. Rodionov A. A., Ozerova L. P., et al. [Retechnologization of aeration tanks for achieving the enhanced nutrients removal: case study of the Naberezhye Chelny wastewater treatment facilities]. Nailuchshchie Dostupnye Tekhnologii Vodosnabzheniia i Vodootvedeniia, 2015, no. 2, pp. 27–34. (In Russian).
  6. Smyrnov O. V., Nikulin A. Iu. [The results of introducing best available technologies at the Voronezh wastewater treatment facilities]. Nailuchshchie Dostupnye Tekhnologii Vodosnabzheniia i Vodootvedeniia, 2019, no. 4, pp. 56–63. (In Russian).
  7. Gogina E. S., Gul’shin I. A., Arkhipova N. A. [Cost effective upgrade of the biological treatment facilities in Kolomna: 10 years of the successful operation]. Nailuchshchie Dostupnye Tekhnologii Vodosnabzheniia i Vodootvedeniia, 2018, no. 2, pp. 46–51. (In Russian).

Banner Oct 2024