Tag:biological treatment plant

№10|2018

WASTEWATER TREATMENT

bbk 000000

UDC 628.35

Rublevskaya O. N., Lominoga O. A., Keish V. S., Protasovskii E. M.

The project of wastewater treatment facilities for Molodezhnoe Settlement of the Kurort District of Saint-Petersburg

Summary

The project of the wastewater treatment facilities for Molodezhnoe Settlement of the Kurort District of Saint-Petersburg is presented. The wastewater treatment facilities include: the main pumping station, a combined mechanical wastewater treatment unit, an equalizing tank, a bioreactor (aeration tank operating the technology of nitri-denitrification) for enhanced nitrogen removal, a membrane bioreactor, an effluent UV-disinfection plant, a screw press for excess activated sludge dewatering. Separation of activated sludge and effluent is provided by three blocks each containing 8 membrane filtration modules each with a capacity of 104 m3/day. In the given project the membrane bioreactor acts as a secondary settling tank and tertiary treatment facilities. To provide for enhanced phosphorus removal aluminium sulphate is dosed at the biological treatment stage. Disinfected effluent is discharged through the outfall into the Gulf of Finland. Dewatered excess activated sludge is transported by trucks to the sludge incineration plant of the Northern Wastewater Treatment Plant. Gas emissions generated in the process of wastewater treatment are cleaned in a sorption-plasmacatalytic unit and a biofilter. The technology designed in the project provides for enhanced treatment of wastewater and gas emissions resulting in the significant improvement of the environment in the Kurort District of Saint-Petersburg.

Key words

, , , , , ,

 

№5|2021

WASTEWATER TREATMENT

DOI 10.35776/VST.2021.05.04
UDC 628.35:661.5

Kondrashev Viacheslav, Metelitsa Sergei

Stages of launching a biological treatment plant at the wastewater treatment facilities with dosing easily oxidable organic matter

Summary

Issues related to commissioning a biological treatment plant at the facilities for household and similar in composition wastewater treatment during the trial start of the treatment facilities are considered. The stages of commissioning a biological treatment plant at the wastewater treatment facilities with «inoculating» activated sludge from the operating biological treatment facilities and with dosing easily oxidable organic matter are considered in detail. The equipment configuration of the WWTP-9 produced by Germes Group is described. All stages of the biological treatment plant commissioning are considered through the example of the start-up of WWTP-9 with the use of numerous experimental data. The periods of biological treatment plant commissioning stages have been determined. The problems of adjusting the biological treatment plant and the ways of their elimination to achieve the required result are presented. The technology used at the WWT facilities provides for the effluent quality that meets the requirements for the discharge into a water body of commercial fishing importance.
чения.

Key words

, , , , ,

 

vstmag engfree 200x100 2

Banner Oct 2024

ЭТ 2024 200х200px V2

myproject msk ru

Баннер конференции г. Пятигорск

мнтк баннер

souz ingenerov 02

Aquatherm 200x200 gif ru foreign