Egorova Yu. A., Mel’nikova Ol’ga, Strelkova Tat’iana, Kell’ Oksana

Experience in adjusting process flow patterns at the wastewater treatment facilities following the major reconstruction

Summary

The experience of the performance adjustment of the Samara wastewater treatment facilities is considered following their major reconstruction carried out in compliance with the best available technologies. As part of the reconstruction, new screen buildings – not previously existing – were constructed. The University of Cape Town (UCT) process for the biological removal of nitrogen and phosphorus compounds with enhanced chemical-based phosphorus removal was retrofitted into the existing aeration tanks. In the process of the performance adjustment the laboratory monitoring of the treatment operation efficiency was completely redesigned.  Sampling control points were changed, and the set of parameters to be measured was determined. The project confirmed the necessity of conducting the performance adjustment of the process flow patterns at the wastewater treatment plants following reconstruction.

Key words

, , , , , ,

 

Журнал ВСТ включен в новый перечень ВАК

Frog book Banner 200x200

 Banner Shl

Banner Kofman