№2|2017

WASTEWATER TREATMENT

bbk 000000

UDC 628.31:661.5

MOROZOVA K. M., Stepanov S. V., Stepanov A. S., Sokolova T. V., Solkina O. S., Zhukova M. A.

Biological treatment of dairy industry wastewater in a membrane bioreactor
(part 2)

Summary

The technology of biological treatment of dairy wastewater is described that provides for meeting the standard maximum permissible concentrations for fishery water bodies. The results of the experimental studies in a pilot membrane bioreactor with real wastewater of «Pestravskii» butter factory are presented. The main process and kinetic parameters of the biological wastewater treatment processes have been obtained that are needed for designing a membrane bioreactor with nitrification-denitrification that provides for meeting the standard maximum permissible concentrations for fishery water bodies or requirements to the effluents discharged into a public sewer. The maximum specific rate of diary wastewater pollutants oxidation Vmax at 7 g/l activated sludge concentration and 20 °С temperature is 40 mg/(g·h), Michaelis constant Km – 15 mg/l, inhibition coefficient of metabolism products  – 0.54 l/g, temperature constant X for aerobic heterotrophic conversion – 0.079 deg–1. Compared to the traditional treatment facilities the use of biomembrane techno­logy at the wastewater biological treatment stage provides for 1.4–1.5 reducing the treatment time, reactor volume and footprint owing to the increase of the oxidation capacity of the aeration units by increasing the activated sludge concentration to 10 g/l; and ensuring almost complete removal of suspended solids by eliminating the tertiary treatment stage. Possible elimination of chemical flotation stage before biological treatment is shown that provides for reducing the expenditures for expensive chemicals and streamlining the process flow scheme.

Ключевые слова

, , , , ,

 

№2|2017

WASTEWATER TREATMENT

bbk 000000

UDC 628.3

Kalmykov A. A.

The use of energy efficient technologies of wastewater treatment: ways of solution and implementation problems
(to be discussed)

Summary

Currently in different Russian cities in the process of operation and maintenance of wastewater treatment facilities designed and constructed in 1970-ies the problems often arise that are typical for many water and wastewater utilities in Russia. Ways of solving these problems in the process of upgrade are also typical and represent a package of measures that should be implemented on a branch basis. The potential of the advanced equipment and technologies that provide for improving the efficiency of the treatment facilities operation at significant energy saving as well as for solving the problems of upgrading treatment facilities under the conditions of tariff regulation and lack of competent professionals is presented.

Key words

, , , ,

 
<< Start < Prev 1 2 Next >> End >
Page 2 of 2

Banner Oct 2024

myproject msk ru

Баннер конференции г. Пятигорск

мнтк баннер

souz ingenerov 02

Aquatherm 200x200 gif ru foreign