Tag:reconstruction of wastewater treatment facilities

№4|2024

WASTEWATER TREATMENT

UDC 628.35
DOI 10.35776/VST.2024.04.07

Bagaev Iurii, Kharkina O. V., Krasavin Grigorii, Gundyreva Tat’iana

Development of basic process solutions for the reconstruction
of wastewater treatment facilities in Novosibirsk

Summary

An example of process solutions for the reconstruction of existing wastewater treatment plants using increased concentration of activated sludge and acidification of primary sludge is given. It has been shown that achieving the required effluent quality (N–NH4 = 1 mg/l, N–NO3 = 9 mg/l, N–NO2 = 0.1 mg/l, Р–РО4 = 0.7 mg/l) during the reconstruction of the facilities, the implementation of nitrogen and phosphorus removal processes in existing aeration tanks, with the actual flow of incoming wastewater, is possible by increasing the concentration of activated sludge in the aeration tanks to 5.2 g/l, which requires the installation of tertiary treatment filters downstream sludge separation in the secondary settling tanks. The use of tertiary treatment facilities to remove suspended solids is determined in comparison with a more expensive construction of an additional biological treatment unit operating with medium doses of activated sludge. It is shown that the information and technical reference book ITS 10-2019 being a recommendation and not a mandatory document, allows for the use of filtration structures for effluent discharge into category B water bodies. The issues of the responsibility of the designers of basic process solutions for achieving the required effluent quality during the implementation of the project are considered for two cases: first – the main process solutions and the project is developed by one company; second – the main process solutions and the project are developed by different companies.

Key words

, , , , , , ,

 

Banner Oct 2024

myproject msk ru

Баннер конференции г. Пятигорск

souz ingenerov 02

Aquatherm 200x200 gif ru foreign