UDC 628.16.006.7 DOI 10.35776/VST.2026.11.03
Biriukov V. V., Egorova Yu. A., Strelkov Aleksandr, Talovyria Larisa, Erchev Viacheslav, Kashkinov Igor’, Nikitin Aleksei, Vardanian Aram
Implementation of measures for the upgrade and reconstruction of water treatment plants. Water quality and reliability of water supply systems
Summary
To meet the tightened Russian drinking water quality standards, upgrading and refitting the existing water treatment processes is required by incorporating additional barriers: UV disinfection (to target viruses and pathogenic protozoa) and sorption-based treatment – including the use of powdered activated carbon (to remove technogenic organic pollution, dioxins, phenols, oil products, and chlororganic compounds). Furthermore, the operational reliability of water supply systems must be enhanced by using both surface and groundwater sources (through the blending and subsequent advanced treatment of the water). For this purpose, the existing water treatment plants are being reconstructed and their equipment upgraded. It is demonstrated that such solutions having been implemented at the Samara water utilities in the early 2010-ies, nowadays are subject to continuous improvement – specifically, switching toward the energy-efficient technologies that use domestically produced components and software. Thereby the practical feasibility and effectiveness of a phased upgrade of water supply systems in large cities, ensuring both the safety of drinking water and the overall reliability of the water supply infrastructure are proved correct.
Key words
reconstruction , sodium hypochlorite , water treatment , modernization , chloroform , chemical workshop , residual aluminium , chemicals , aluminium polyoxychloride , UV disinfection , total hardness , surface and underground water supply sources , drinking water quality standard , contact clarifiers , powdered sorbents , activated carbons
|
UDC 628.16:628.11 DOI 10.35776/VST.2026.11.01
Biriukov V. V., Egorova Yu. A., Rakitskii D. S., Davydov Igor’
Reconstruction and development of water supply systems. Measures to bring drinking water quality into compliance with the sanitary requirements
Summary
As part of the plan to bring the drinking water quality into compliance with the established requirements, Samarskie Kommunal’nye Sistemy LLC has constructed new water pipelines from the surface water source, supplying drinking water from the water treatment facilities to the Kuibyshevskii and Krasnoglinskii districts of the Samara Urban District. Previously, the indicated areas were supplied with drinking water from underground water sources (artesian wells), where the water, due to the natural hydrogeological conditions, was characterized by excessive mineralization, with higher levels of total hardness, dry residue, and manganese. Following the enactment of Resolution No. 3 of the Chief Sanitary Officer of the Russian Federation dated January 28, 2021, the new sanitary rules and regulations were approved and came into effect in the Russian Federation on March 1, 2021: SanPiN 2.1.3684-21 and SanPiN 1.2.3685-21 that established a more stringent approach to the quality of purified water. In this regard, the plan of bringing the drinking water quality in compliance with the sanitary standards was updated, including measures for the comprehensive upgrade and reconstruction of the water supply system in the Samara Urban District by 2030.
Key words
water treatment , chloroform , residual aluminium , total hardness , improving drinking water quality , construction of water mains , surface and underground water supply sources , SanPiN
|
|