№5|2022

PRACTICAL NOTES

DOI 10.35776/VST.2022.05.06
UDC 628.356

Matуushenko Evgeny, Rebitva Sergei, Borisova Kristina

Wastewater treatment of a cottage estate. Design and operational errors

Summary

The principle of operation, as well as the errors while designing and operating a compact wastewater treatment plant with a design capacity of 500 m3/day (actual flow rate is 250–280 m3/day) are considered. The treatment facilities have been designed in two phases and include the stages of mechanical and biological treatment, followed by tertiary treatment in biofilters with expanded clay media, and UV disinfection of the effluent after biological treatment. Gravity sludge thickeners and dehydrators are provided for processing the resulting sludge. Upon the detailed consideration of the design solutions, as well as the problems revealed during the operation, design errors were identified that made it impossible to ensure the required quality of wastewater treatment. Currently, to enhance the operation of the complex, a number of facilities are being upgraded. This will provide for reaching the stable operation of the complex and ensuring the standard indicators at the MPC level for organic and suspended solids in the effluent before being discharged into a water body.

Key words

, , , , ,

The further text is accessible on a paid subscription.
For authorisation enter the login/password.
Or subscribe

Список цитируемой литературы

  1. Ambrosova G. T., Kruglikova A. V., Kolodeznikova A. P., Semenova A. P. [Analysis of designs of compact wastewater treatment plants]. Voda i Ekologiia: Problemy i Resheniia, 2021, no. 3 (87), pp. 3–15. (In Russian).
  2. El’ Iu. F., Reshetilov Iu. I. [Conceptual changes in wastewater treatment technologies]. Vodosnabzhenie i Sanitarnaia Tekhnika, 2009, no. 5, pp. 57–63. (In Russian).
  3. Ambrosova G. T., Semenova A. P., Kolodeznikova A. P. [Compact units for domestic wastewater treatment]. Stroitel’stvo i Tekhnogennaia Bezopasnost’, 2018, no. 12 (64), pp. 109–115. (In Russian).
  4. Ambrosova G. T., Tikhonova D. V., Iakovleva E. I. [Process flow schemes for wastewater treatment in the city of Bolotnoe]. Vodoochistka. Vodopodgotovka. Vodosnabzhenie, 2019, no. 7 (139), pp. 62–66. (In Russian).
  5. Stepanov S. V., Stashok Iu. E., Gabidullina L. A. [Modular membrane bioreactors]. Vodoochistka. Vodopodgotovka. Vodosnabzhenie, 2017, no. 2 (110), pp. 40–42. (In Russian).
  6. Titov E. A. Intensifikatsiia ochistki khoziaistvenno-bytovykh stochnykh vod na kompaktnykh ustanovkakh s ispol’zovaniem prikreplennykh biotsenozov i flokuliantov [Intensification of domestic wastewater treatment in compact plants using attached biocenoses and flocculants. Synopsis of a thesis for Ph. D. degree in Engineering, Penza, 2006, 156 p.].
  7. Zhmur N. S. [Analysis of the reasons for the inefficiency of small-scale biological treatment facilities]. Vodosnabzhenie i Kanalizatsiia, 2011, no. 6, pp. 16–35. (In Russian).
  8. ITS 10-2019. Ochistka stochnykh vod s ispol’zovaniem tsentralizovannykh sistem vodootvedeniia poselenii, gorodskikh okrugov [ITS 10-2019. Wastewater treatment with the use of public wastewater disposal systems of communities, urban districts. Moscow, Biuro NDT, 2019, 434 p.].
  9. Mishukov B. G., Solov’eva E. A. Membrannye biologicheskie reaktory dlia glubokoi ochistki stochnykh vod [Membrane biological reactors for advanced wastewater treatment. Saint-Petersburg, SPbGEU, 2017, 64 p.].

Banner Oct 2024

myproject msk ru

Баннер конференции г. Пятигорск

мнтк баннер

souz ingenerov 02

Aquatherm 200x200 gif ru foreign